NGHIÊN CỨU MÔ HÌNH 4D-EVM ĐỂ NÂNG CAO NĂNG LỰC KIỂM SOÁT DỰ ÁN XÂY DỰNG
Thông tin bài báo
Ngày nhận bài: 10/02/25                Ngày hoàn thiện: 10/04/25                Ngày đăng: 12/04/25Tóm tắt
Từ khóa
Toàn văn:
PDF (English)Tài liệu tham khảo
[1] R. Hasan, S. A. Chowdhury, and J. Akter, “Construction Project Monitoring: The Cost and Schedule Control by Earned Value Method (EVM),” Journal of Technology Management and Business, vol. 8, no. 1, Jun. 2021, doi: 10.30880/jtmb.2021.08.01.001.
[2] Project Management Institute, The standard for project management and a guide to the project management body of knowledge (PMBOK guide), 7th ed., Project Management Institute, Inc., 2021.
[3] S. Babar, M. J. Thaheem, and B. Ayub, “Estimated Cost at Completion: Integrating Risk into Earned Value Management,” J. Constr. Eng. Manag., vol. 143, no. 3, 2017, doi: 10.1061/(asce)co.1943-7862.0001245.
[4] M. R. Feylizadeh, A. Hendalianpour, and M. Bagherpour, “A fuzzy neural network to estimate at completion costs of construction projects,” International Journal of Industrial Engineering Computations, vol. 3, no. 3, 2012, doi: 10.5267/j.ijiec.2011.11.003.
[5] Ö. Hazir, “A review of analytical models, approaches and decision support tools in project monitoring and control,” International Journal of Project Management, vol. 33, no. 4, 2015, doi: 10.1016/j.ijproman.2014.09.005.
[6] M. N. Ibrahim, D. Thorpe, and M. N. Mahmood, “Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia,” Construction Innovation, vol. 19, no. 4, 2019, doi: 10.1108/CI-07-2018-0058.
[7] A. Maskrey, G. Jain, and A. Lavell, “The Social Construction of Systemic Risk: Towards an Actionable Framework for Risk Governance,” Disaster Prevention and Management an International Journal, vol. 32, no. 1, 2023, doi: 10.1108/dpm-07-2022-0155.
[8] D. A. Nguyen, M. J. Garvin, and E. E. Gonzalez, “Risk Allocation in U.S. Public-Private Partnership Highway Project Contracts,” J. Constr. Eng. Manag., vol. 144, no. 5, pp. 1–13, 2018, doi: 10.1061/(ASCE)CO.1943-7862.0001465.
[9] J. Teller, A. Kock, and H. G. Gemünden, “Risk Management in Project Portfolios Is More Than Managing Project Risks: A Contingency Perspective on Risk Management,” Project Management Journal, vol. 45, no. 4, 2014, doi: 10.1002/pmj.21431.
[10] J. K. Larsen, G. Q. Shen, S. M. Lindhard, and T. D. Brunoe, “Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects,” Journal of Management in Engineering, vol. 32, no. 1, pp. 1–10, Jan. 2016, doi: 10.1061/(asce)me.1943-5479.0000391.
[11] A. R. Rumane, Quality Management in Construction Projects, 2nd ed. Taylor & Francis Group, 2018.
[12] A. Barrientos-Orellana, P. Ballesteros-Pérez, D. Mora-Melia, M. C. González-Cruz, and M. Vanhoucke, “Stability and accuracy of deterministic project duration forecasting methods in earned value management,” Engineering, Construction and Architectural Management, vol. 29, no. 3, 2022, doi: 10.1108/ECAM-12-2020-1045.
[13] B.-C. Kim, “Probabilistic Evaluation of Cost Performance Stability in Earned Value Management,” Journal of Management in Engineering, vol. 32, no. 1, 2016, doi: 10.1061/(asce)me.1943-5479.0000383.
[14] A. Nizam and A. Elshannaway, “Review of earned value management (EVM) methodology, its limitations, and applicable extensions,” Journal of Management and Engineering Integration, vol. 12, no. 1, 2019, doi: 10.62704/10057/24251.
[15] Inc. Project Management Institute, Construction Extension to the PMBOK® Guide. Project Management Institute, Inc., 2016, doi: 10.1002/pmj.
[16] F. Acebes, M. Pereda, D. Poza, J. Pajares, and J. M. Galán, “Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques,” International Journal of Project Management, vol. 33, no. 7, 2015, doi: 10.1016/j.ijproman.2015.06.012.
[17] T. Yu et al., “Evaluating different stakeholder impacts on the occurrence of quality defects in offsite construction projects: A Bayesian-network-based model,” J. Clean. Prod., vol. 241, 2019, doi: 10.1016/j.jclepro.2019.118390.
[18] K. Panuwatwanich and T. T. Nguyen, “Influence of Total Quality Management on Performance of Vietnamese Construction Firms,” in Procedia Engineering, Elsevier Ltd, 2017, pp. 548–555, doi: 10.1016/j.proeng.2017.03.151.
[19] P. E. D. Love and C.-P. Sing, “Determining the probability distribution of rework costs in construction and engineering projects,” Structure and Infrastructure Engineering, vol. 9, no. 11, pp. 1136–1148, 2013, doi: 10.1080/15732479.2012.667420.
[20] B.-C. Kim and J. K. Pinto, “What CPI = 0.85 Really Means: A Probabilistic Extension of the Estimate at Completion,” Journal of Management in Engineering, vol. 35, no. 2, 2019, doi: 10.1061/(asce)me.1943-5479.0000671.
[21] A. Tereso, P. Ribeiro, and M. Cardoso, “An Automated Framework for the Integration between EVM and Risk Management,” Journal of Information Systems Engineering & Management, vol. 3, no. 1, 2018, doi: 10.20897/jisem.201803.
[22] T. Khesal, A. Saghaei, M. Khalilzadeh, M. R. Galankashi, and R. Soltani, “Integrated cost, quality, risk and schedule control through earned value management (EVM),” Journal of Engineering, Design and Technology, vol. 17, no. 1, 2019, doi: 10.1108/JEDT-07-2018-0119.
[23] J. McKenzie, “Mean absolute percentage error and bias in economic forecasting,” Econ Lett, vol. 113, no. 3, 2011, doi: 10.1016/j.econlet.2011.08.010.
DOI: https://doi.org/10.34238/tnu-jst.12015
Các bài báo tham chiếu
- Hiện tại không có bài báo tham chiếu