ẢNH HƯỞNG CỦA GIÁ ĐIỆN DỰ BÁO ĐẾN LẬP KẾ HOẠCH VẬN HÀNH CỦA NHÀ MÁY TUABIN KHÍ CHU TRÌNH HỖN HỢP TRONG THỊ TRƯỜNG ĐIỆN
Thông tin bài báo
Ngày nhận bài: 14/05/25                Ngày hoàn thiện: 24/10/25                Ngày đăng: 27/10/25Tóm tắt
Từ khóa
Toàn văn:
PDFTài liệu tham khảo
[1] L. Bai, F. Li, H. Cui, T. Jiang, H. Sun, and J. Zhu, “Interval optimization based operating strategy for gas-electricity integrated energy systems considering demand response and wind uncertainty,” Appl. Energy, vol. 167, pp. 270–279, Apr. 2016, doi: 10.1016/j.apenergy.2015.10.119.
[2] J. Beiron, R. M. Montañés, F. Normann, and F. Johnsson, “Flexible operation of a combined cycle cogeneration plant – A techno-economic assessment,” Appl. Energy, vol. 278, Nov. 2020, Art. no. 115630, doi: 10.1016/j.apenergy.2020.115630.
[3] N. V. Pham, T. Le, M. H. Do, and D. L. Vu, “Day-ahead Unit Commitment for Combined-Cycle Gas Turbine and Coal-Fired Thermal Integrated Power Systems,” TNU J. Sci. Technol., vol. 230, no. 02, pp. 284–294, Feb. 2025, doi: 10.34238/tnu-jst.11897.
[4] T. Jiang et al., “Exploiting flexibility of combined-cycle gas turbines in power system unit commitment with natural gas transmission constraints and reserve scheduling,” Int. J. Electr. Power Energy Syst., vol. 125, Feb. 2021, Art. no. 106460, doi: 10.1016/j.ijepes.2020.106460.
[5] A. Borghetti, C. D’Ambrosio, A. Lodi, and S. Martello, “An MILP Approach for Short-Term Hydro Scheduling and Unit Commitment with Head-Dependent Reservoir,” IEEE Trans. Power Syst., vol. 23, no. 3, pp. 1115–1124, Aug. 2008, doi: 10.1109/TPWRS.2008.926704.
[6] A. J. Conejo, F. J. Nogales, J. M. Arroyo, and R. Garcia-Bertrand, “Risk-constrained self-scheduling of a thermal power producer,” IEEE Trans. Power Syst., vol. 19, no. 3, pp. 1569–1574, Aug. 2004, doi: 10.1109/TPWRS.2004.831652.
[7] H. Haghighat, H. Seifi, and A. R. Kian, “On the self-scheduling of a power producer in uncertain trading environments,” Electr. Power Syst. Res., vol. 78, no. 3, pp. 311–317, Mar. 2008, doi: 10.1016/j.epsr.2007.02.012.
[8] H. Hui, C.-N. Yu, F. Gao, and R. Surendran, “Combined cycle resource scheduling in ERCOT nodal market,” in 2011 IEEE Power and Energy Society General Meeting, Jul. 2011, pp. 1–8, doi: 10.1109/PES.2011.6039463.
[9] F. J. Heredia, M. J. Rider, and C. Corchero, “Optimal bidding strategies for thermal and combined cycle units in the day-ahead electricity market with bilateral contracts,” in 2009 IEEE Power & Energy Society General Meeting, Jul. 2009, pp. 1–6, doi: 10.1109/PES.2009.5275680.
[10] N. H. Kjeldsen and M. Chiarandini, “Heuristic solutions to the long-term unit commitment problem with cogeneration plants,” Comput. Oper. Res., vol. 39, no. 2, pp. 269–282, Feb. 2012, doi: 10.1016/j.cor.2011.03.018.
[11] K. Pan and Y. Guan, “Data-Driven Risk-Averse Stochastic Self-Scheduling for Combined-Cycle Units,” IEEE Trans. Ind. Inform., vol. 13, no. 6, pp. 3058–3069, Oct. 2017, doi: 10.1109/TII.2017.2710357.
[12] M. González-Sierra and S. Wogrin, “Self-Unit Commitment of Combined-Cycle Units with Real Operational Constraints,” Energies, vol. 17, no. 1, Jan. 2024, doi: 10.3390/en17010051.
[13] G. Morales-España, C. M. Correa-Posada, and A. Ramos, “Tight and Compact MIP Formulation of Configuration-Based Combined-Cycle Units,” IEEE Trans. Power Syst., vol. 31, no. 2, pp. 1350–1359, Mar. 2016, doi: 10.1109/TPWRS.2015.2425833.
[14] C. Liu, M. Shahidehpour, Z. Li, and M. Fotuhi-Firuzabad, “Component and Mode Models for the Short-Term Scheduling of Combined-Cycle Units,” IEEE Trans. Power Syst., vol. 24, no. 2, pp. 976–990, May 2009, doi: 10.1109/TPWRS.2009.2016501.
[15] GAMS Development Corp., "GAMS Documentation 46," Feb. 17, 2024. [Online]. Available: https://www.gams.com. [Accessed Feb. 25, 2024].
DOI: https://doi.org/10.34238/tnu-jst.12808
Các bài báo tham chiếu
- Hiện tại không có bài báo tham chiếu





